The construction specification and the warranty

The construction spec itemised with brands and numbers, what is not included, the inspection process, the 5% retention, and the 5 / 3 / 1-year warranty.

Brands in the table are typical placeholders; the contract annex names them as “or equivalent”.

Foundation

Piling
Spun micropile, driven to bearing stratum ~21 m; per-plot soil boring report available

Structure

Frame
Cast-in-place reinforced concrete; SD40 deformed bar; concrete cylinder-tested at 240 ksc
Ground slab
100 mm RC on compacted structural fill, damp-proof membrane

Walls

External
AAC block 100 mm (autoclaved aerated concrete), cement render both faces, exterior acrylic coating system
Internal
AAC block 75 mm / lightweight partition to wet areas

Roof

Covering
Concrete roof tile on treated purlins
Insulation
Double layer — foil-faced sarking under the tile plus 50 mm glass-wool blanket over the ceiling; ridge ventilation
Ceiling
12 mm smoothboard, 2.80 m height (3.10 m in the House 3 Plus living room)

Openings

Windows
Aluminium frame, 6 mm tempered glass (laminated where required by code); insect screens standard on all operable panes
Entry door
Solid engineered-timber leaf, digital-lock provision (unit not included)

Electrical

Service
3-phase, 15 (45) A; consumer unit with RCBO per circuit
Provisions
TV/data conduit to living + all beds; dedicated 32 A circuit to the carport, EV-ready (charger unit not included)

Water

Supply
Municipal (การประปาส่วนภูมิภาค) + 2,000 L underground tank + automatic pump
Piping
PPR hot & cold; water-heater point in every bathroom (heaters not included)

Sanitary

Fittings
Vitreous-china WC and basins; thermostatic mixer in the master bath

Wastewater

Treatment
Per-house aerobic treatment tank, discharge to the project drainage; no soakaway

Finishes

Floor
600 × 600 porcelain tile to living/kitchen/terrace; SPC laminate to bedrooms
Kitchen
Built-in lower units, stone-look worktop, sink, cooker hood
Wardrobe
Melamine carcasses to all bedrooms (no internal fit-out)
Paint
Washable acrylic, one colour throughout

Wall & roof build-up

Concrete roof tileFoil-faced sarkingAir gap + purlinsGlass-wool 50 mmSmoothboard 12 mmRender + exterior coatAAC block 100 mmRender + interior paint2.80 m

What is not included

Inspection, retention and warranty

Two stages. (1) Structure & roof inspection during the build — the buyer may attend. (2) Pre-transfer snag inspection against a checklist the buyer keeps a copy of.

Developer remedies within 30 days; the buyer holds 5% retention, capped at ฿200,000.

From the transfer date: structure 5 years · roof & waterproofing 3 years · general fittings & finishes 1 year (consistent with the Consumer Protection Board standard sale contract).

Claims via a form; developer acknowledges within 7 days, starts remedial work within 30 days.